Skip to primary content
Skip to secondary content

House Project

Rebuilding a Kent Home

House Project

Main menu

  • Home
  • The Brief
  • 1977 Design
  • New Proposed Design

Post navigation

← Older posts
Newer posts →

June 14th, Friday – Progress Photos

Posted on June 14, 2019 by datchetman
Reply

Scaffold Coming on Sunday apparently.  Brick Layers not working this weekend.

Posted in Bricklaying, Uncategorized | Leave a reply

Check of window in Dummy Showeroom Downstairs

Posted on June 14, 2019 by datchetman
Reply

680mm wide

1340 from northeast corner

So subtract 300mm for wall finishing blocks, insulation, plaster and you get window is 1040mm from the corner.

….. shower cubicle should fit there as planned!!

Posted in Bricklaying, Uncategorized | Leave a reply

Alternative Supply point – Karcher Verona Steel ER37 (73)

Posted on June 14, 2019 by datchetman
Reply

https://www.karcherhandles.co.uk/view-product/karcher-verona-steel–er37-73

Posted in Internal Doors, Uncategorized | Leave a reply

Must Research “Bearing Hinges”

Image

Reply

June 14, 2019 by datchetman
Posted in Internal Doors, Uncategorized Leave a reply

June 13 – new breakfast and dining rooms at DPC level

Image

Reply

June 13, 2019 by datchetman
Posted in Bricklaying, Uncategorized Leave a reply

June 13 – new north end

Image

Reply

June 13, 2019 by datchetman
Posted in Uncategorized Leave a reply

Tim taking Walls Down

Image

Reply

June 12, 2019 by datchetman
Posted in Uncategorized Leave a reply

First breach in the wall showing the start of the 9.5 metre kitchen emerging.

Posted on June 12, 2019 by datchetman
Reply

It will stretch beyond the stack of blocks outside the window

Posted in Uncategorized | Leave a reply

Rain stopped Brick Laying again

Posted on June 12, 2019 by datchetman
Reply

Some walls up to waist level.

Posted in Bricklaying, Uncategorized | Leave a reply

Support for walls on the upper storey

Posted on June 12, 2019 by datchetman
Reply

It turns out that the dividing wall between bedrooms 3 and 4 is not supported on the old south kitchen wall, but is actually supported by this double joist.

Posted in Uncategorized | Leave a reply

Post navigation

← Older posts
Newer posts →

Enter your email address to follow this blog and receive notifications of new posts by email.

Join 16 other subscribers

House Project Summary

  • Original Design
  • Proposed Design
  • The Journey Begins

Category Selection

  • Airing Cupboard
  • Alarms
  • Bathrooms
  • Bedrooms
  • Bifolds
  • Bike Room
  • Bricklaying
  • Broadband
  • Carpentry
  • Carpets
  • Ceilings
  • Cladding
  • Decorating
  • Dining Room
  • Drainage
  • Dressing Room
  • Drive
  • Electrician
  • Est Side
  • External Doors
  • External Works
  • Family Room
  • Fireplace
  • Floor
  • Furniture
  • Garage
  • Garden
  • Hall
  • Heating
  • Insulation
  • Internal Doors
  • Internal Walls
  • Kitchen
  • Lamp Post
  • Lighting
  • Loft
  • Lounge
  • Mail Box
  • Measurements
  • Patio
  • Plastering
  • Plumbing
  • Porch
  • Project Plans
  • Roof
  • Scaffold
  • Services
  • Staircase
  • Steels
  • The Slab
  • Tiling
  • Tour
  • Uncategorized
  • Utility Room
  • Velux
  • Wardrobes
  • Water Softener
  • West Wing
  • Windows
Create a free website or blog at WordPress.com.
House Project
Create a free website or blog at WordPress.com.
Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
  • Subscribe Subscribed
    • House Project
    • Already have a WordPress.com account? Log in now.
    • House Project
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...
 

    Design a site like this with WordPress.com
    Get started