October 23

Rain is expected later today so a temporary roof has been erected over the hobby room roof to allow flat roof covering first layer to progress. Both flat roofs will have their final layers installed after cladding has been fixed to the house walls to avoid damage to the final surfaces.
Plasterer arrived tomorrow. On site staff are aware of the plaster cracks on the east walls. I will look in first thing. Mid morning tomorrow (Thursday) we have to go to Essex to meet some friends. We will be home around 6pm. Apart from Waitrose I will be around Friday. Catherine is in all day. Not sure of your arrival time in London. Have a good flight.

October 23

Yesterday was dry so first layer of dining room flat roof was laid. The drainage outlet can be seen on the north side expelling onto the sloping tiles into the main gutter. The same arrangement will be installed at the north side of the hobby room roof.

Alarm Keypads

Keypads now all chased in.
On the landing radiator wall I think the middle chasing will be filled in. The thermostat control for the bathroom will sit alongside the left hand light switch. My understanding is that this thermostat is wireless but I will check and confirm.