The builder has been trying to deal with the varying levels of the garden versus the house. They have excavated out to where the edge of the patio and paths would be, and the soil there is at a much higher elevation. A beaten slope looks pretty much impractical, so a low retaining wall is being used. It’s block today, but when I asked they said it would be brick faced – to check with Nick. Only the groundworks team were at the site today.
Next week is probably too get the drains in.


The garden is much more tapering now – it is probably a hugely better application of the acreage for us – we shall use it much more.






Note below – it looks like drain pipes have been delivered.


































