Category Archives: Uncategorized
Adrian digging out a gate post in sweltering heat
Garage internal door aperture
Image
New Double Door to Dining Room
Image
One of the new roof windows in the Hall takes shape
Image
Progress Photos – Friday July 9th
Looking like something from war-torn Bosnia now. Windows all out and new slab being poured during site meeting.
Note new lobby roof has emerged.



The New Slab is Poured (July 19)
There’s 150mm of new slab in the lounge !! And also ver the ground floor.
It was delivered by two huge concrete mixer trucks and a separate wagon to pump it in. The put the pumping wagon into the drive first, then each of the giant wheelers reversed up to it, and unloaded into the pump truck – and then it went onwards into the floor void. There’s a black DPC in there underneath that.
It will be walk-on hard tomorrow and dried by Monday.

A Dribble of cement left over

The New Silver Grey Cladding Has Arrived
Image
Interesting Gate Lock Idea
Image
Progress as at June 21st
No bricklayers today… they are working tomorrow, Saturday, to catch up. Lintels next week.
Garage Roof Gone.

Slab pieces in the barrow.

Shifting The Slab with an excavator.