The New Slab is Poured (July 19)

There’s 150mm of new slab in the lounge !! And also ver the ground floor.

It was delivered by two huge concrete mixer trucks and a separate wagon to pump it in.  The put the pumping wagon into the drive first, then each of the giant wheelers reversed up to it, and unloaded into the pump truck – and then it went onwards into the floor void.  There’s a black DPC in there underneath that.

It will be walk-on hard tomorrow and dried by Monday.

A Dribble of cement left over