Update Saturday Jan 18

This is how the door handles on the bathrooms will be arranged.

Good progress on the patio slabs, the large uncut ones going down first. The random pattern looks great!

This is the new router area of the “plant cupboard”.  Router mounted neatly on wall with two cables going up to the study for the MESH network. The square box beneath the router is the Velux controller.

Ensuite of bedroom 2 almost finished

Carpet in new Office is down – needs a clean!!

Nice new loft hatch

A Potential Model for our Porch and Steps at Front Door

We have a drop of three brick courses plus a bit from the front door threshold down to the driveway surface.  It’ll mean two steps – and here is a sample nearby dealing with the size size challenge.  It could be a model for what we need and blend in with the porch ideas.

Dec 20th – Slot Drains

In order that we can get the patio and path levels right up close to “level threshold” we have to fit these rather clever “slot drains” against the house walls, just below DPC level. The idea that any water run-off gathering there drops down the slot and is carried away.  It’ll be interesting to watch those go in.