Tour – Bedroom 2… quite a lot has changed

Quite a lot has changed in bedroom 2.  A dressing room has been added (along with the house’s new airing cupboard) as well as another lovely bathroom.

The view out over the garden has been radically changed too.

The new dressing room – on the left is the new airing cupboard, then a double wardrobe alongside.

The new view out of the window:

Update Saturday Jan 18

This is how the door handles on the bathrooms will be arranged.

Good progress on the patio slabs, the large uncut ones going down first. The random pattern looks great!

This is the new router area of the “plant cupboard”.  Router mounted neatly on wall with two cables going up to the study for the MESH network. The square box beneath the router is the Velux controller.

Ensuite of bedroom 2 almost finished

Carpet in new Office is down – needs a clean!!

Nice new loft hatch